The only thing you need to obtain it are reliable professionals.
Obtaining an environmental permit is a milestone for many investments that paves the way for their realization. Entrusting the problem of overcoming this stage to incompetent people may result in a painful delay in its preparation or, in extreme cases, its complete collapse.
In concept the effective legal procedures are simple, but experience shows the need to select a strategy for solving the problem of obtaining an environmental permit that is appropriate for a specific investment and a specific location. The adequacy of the adopted strategy will depend on the experience and substantive preparation of the experts involved.
Environmental impact analyses require participation of specialists who are able to properly identify the reactions of biotic elements of the environment to planned interference. Not every naturalist is able to understand the complexity of the technical objectives of investment plans and, by establishing cause-effect sequences, predict the changes that will occur in the environment. In many cases, it is necessary to analyze these changes in relation to complex ecosystems or the details of the ecology of specific species.
In the analyses of the projects undertaken, we use our comprehensive knowledge of the functioning of sensitive ecological systems, gathered in other areas of activity. We combine this with legal knowledge and many years of experience, guaranteeing you the most beneficial solutions at every stage of the process of obtaining an environmental permit.
The objectives of investment plans combined with data from the reconnaissance of the area of interference allow us to determine the impact of the planned project on individual elements of the environment.
The key is to identify actual threats and propose appropriate actions that will enable minimization or even elimination of the harmful impact on the environment. In cases where such possibilities are lacking, natural compensations should be designed.
Preparation of an environmental expertise concerning the task entitled: "Repair of the bar raising the lower stand of Włocławek Water Stage"
Environmental inventory as part of the project entitled: "Reconstruction of LOCAL ROAD NO. 130703C – Jana Kasprowicza Street in Barcin"
Carrying out inventory studies of ichthyobiological and hydrobiological environments of the river Vistula and its side channels in the area of planned infrastructure elements of the project entitled: "Construction of a Water Stage on the Vistula below Włocławek."
Carrying out comprehensive field inventories in areas designated for photovoltaic investments and developing documentation in the form of result reports and project information cards – 4 locations (Zawada Photovoltaic Power Plant Complex, Lubań – Lipiny Photovoltaic Power Plant Complex, Zalesie Królewskie Photovoltaic Power Plant Complex, Luszkowo Photovoltaic Power Plant Complex).
Analysis of environmental and legal-administrative conditions for the implementation of a water management structure on the lower river Dunajec for drinking water intake purposes
Preparation of the Environmental Impact Report for the Natura 2000 area for the project involving the reconstruction and restoration of the Teutonic Castle in Świecie
Development of a project information sheet for the project covering the production of candles and candle inserts in Mysłakówko, Tłuchowo borough.
Carrying out an environmental inventory of the investment areas entitled: “Reconstruction of the bridge over the river Brda along Biwakowa Street in Bydgoszcz” and performing expert analysis of the results, along with an assessment of the planned investment’s impact on the environment.
Hydrobiological studies of the lower river Vistula for the project: "Construction of a coal-fired power plant with a capacity of 2000 MW in Rajkowy, Pelplin borough, Pomeranian Voivodeship, along with associated infrastructure and related investments."
Preliminary analysis of environmental conditions for location variants of the water intake and sewage discharge of the river Vistula, for the needs of the planned gas-steam power plant in Włocławek. Study for the investor: Elektrownia Połaniec Spółka Akcyjna Grupa GDF SUEZ Energia Polska.